Coastal & Inshore ConstructionCivil and InfrastructureShotcrete Services including Training & SupervisionHyperbaric TunnelingMiningTunnellingEFNARCExcavation / Concrete Cutting and BreakingGrouting / Injection / RepairsMarine Archaeological Investigation (MAI)Explosive Ordnance Disposal (EOD)Foundation and PilingMulti Pulse Sequencing
- Tuen Mun-Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section
- Central Reclamation Phase III
- NEC South-East Asia Japan Cable System (SJC)
- Wan Chai Development Phase II at Wan Chai East (Stage 3)
- Wan Chai Development Phase II at Hong Kong Convention and Exhibition Centre (Stage 3)
- Wan Chai Development Phase II over MTRC Tsuen Wan Line
- Sludge Treatment Incinerator Facility
- Permanent Aviation Fuel Facility Offshore Pipeline
- Permanent Aviation Fuel Facility Offshore Pipeline
- Shenzhen to Tai Po Jetting
- BPPS & CPPS Term Contract
- Shenzhen to Tai Po Grout Mattress
- CPPS JETTY Survey
- Shenzhen to Tai Po Piled Crossovers
- Central Reclamation
Mining and Underground Construction
- Fruta Del Norte North Portal Access
- WSD Steel Lining at Hin Keng to Diamond Hill Tunnels
- Admiralty Integrated Station & SCL Enabling Works
- Harbour Area Treatment Scheme Stage 2A - Sai Ying Pun Tunnel
- Harbour Area Treatment Scheme Stage 2A - Sandy Bay Tunnel
- Harbour Area Treatment Scheme Stage 2A - Cyberport Tunnel
- Harbour Area Treatment Scheme Stage 2A - Wah Fu Adit
- Harbour Area Treatment Scheme Stage 2A - Sandy Bay Shaft
- Construction of Interconnection Tunnel and Diaphragm Wall for Main Pumping Station at Stonecutters Island Sewage Treatment Works
- Kennedy Town Station & Overrun Tunnel
- Harbour Area Treatment Scheme Stage 2A - Wah Fu Shaft
- Hong Kong West Drainage Tunnel (HKWDT)
- New Delhi & Shivaji Stadium Project
- Udhampur-Srinagar-Baramulla New BG Railway Line Project
- Rampur Hydro Electric Project
- Allain Duhangan 11 Hydro Electric Project
- Route 9 Nam Wan Tunnel & West Tsing Yi Viaduct
- Kwai Chung and Tsz Wan Shan Tunnels
- Sha Tin Tunnel
- Wan Chai East & North Point Sewerage Trunk Sewers
- Penny's Bay Tunnel
- West Rail
- Tseung Kwan O Extension
- Strategic Sewage Disposal System - HATS 1
- T&M Specialists to provide Shotcrete Services for Remedial Works to EFNARC standards
- T&M Specialists to provide Shotcrete Nozzleman training to EFNARC standards
- T&M provide Shotcrete Training to EFNARC Standards in Canada
- T&M provide Shotcrete Training in Indonesia
- Fruta Del Norte North Portal Access
- East Side Access Tunnel Transportationm, Manhattan, NY
- 7.5km Sewage Conveyance System
- Hong Kong MTR South Island Line
- John Hart Generating Station Replacement Project
- Route 9, Nam Wan Tunnels & WTY Viaduct
- Route 8, Shatin Tunnels & Approaches
- Central - Wanchai Bypass and Island Eastern Corridor Link
- DSD Drainage Contract
- Kowloon Southern Loop Nam Cheong to Tsim Sha Tsui
- KCRC East Rail Extensions
- Wanchai East & North Point Sewers - Main Trunk Lines
- KCRC East Rail Extensions
- CLP Power Cable Tunnel Projects
- Wanchai East & North Point Sewers - Main Trunk Lines
- Wanchai East & North Point Sewers - Branches
- CLP Power Cable Tunnel Projects
- Samut Prakarn Bangkok Drainage Flood Master Plan Kings Project
- Marine Archaeological Investigation by SDA Marine Limited (2012)
- Marine Archaeological Investigations (2010)
- Marine Archaeological Investigations (2009)
- Marine Archaeological Investigations (2008)
- Marine Archaeological Investigations (2007)
- Marine Archaeological Investigations (2006)
- Marine Archaeological Investigations (2002)
- Marine Archaeological Investigations (2001)
- Marine Archaeological Investigations (2000)
- Marine Archaeological Investigations (1999)
- The Company acquires the assets of Specialist Gurkha Services UK Limited
- Sudan Route Clearance
- Technical Assistance to Cambodian Mine Action Centre (CMAC)
- United Nations Accelerated De-mining Programme (ADP), Mozambique PTS/CON/200/94
- Kompong Thom Provincial Demining Cell/Demining Unit Number 4 (DU4)
- Mine Clearance Technical Advisers for Angola
- Assistance to UXO Lao, the Laos national UXO clearance programme
- Inhambane Proximity De-mining Programme
- Operational Support to CMAC De-mining Unit Number 4 (DU4) CAMBODIA
- Contract No. TB7010W037P - Clearance of Mine Dump No.6
- Operational Support to the United Nations Mine Action Programme in Northern Iraq
- Contract No. TB88001W041PE - Clearance of Mine Dumps 1 to 5 and Two Minefields
- Sunrise Orphanage UXO Clearance
- Management of UXO Clearance Programme in support of pipeline construction
- UXO Road Clearance Programme Project Implementation
- UXO Clearance in support of seismic survey
- Evaluation of claims by Kuwait against Iraq for environmental damage caused by the use of Landmines and Explosive Ordnance during Iraq's Invasion and occupation of Kuwait in 1990 and 1991
- QA/QC Consultant - North Side Cantonment Area,
Kabul International Airport - Consultant - UXO Clearance Coordinator in support of BGP Viet Nam seismic survey operations
- Consultant - UXO Clearance Coordinator in support of BGP Viet Nam seismic survey operations
- Consultant - UXO Clearance Coordinator in support of seismic survey operations
Renewable EnergyScientific
- Hongkong Electric Lamma Windfarm Met Mast Monitoring Term Contract
- HongKong Electric Company (HEC) Lamma Power Station - Hydrographic Survey incl. Seabed Silt Sampling for Laboratory Testing
- Black Point Power Station (BPPS) - Hydrographic Survey incl. Seabed Silt Sampling for Laboratory Testing
- MTRC- Seabed Sounding & Sampling for IMT & WIT Immersed Tubes and Laboratory testing of marine deposits
- CLP - Tai A Chau WAVE and CURRENT Measurements
Film and Television
Samut Prakarn Bangkok Drainage Flood Master Plan Kings Project
- Thailand
- Narawat - Mermaid Maritime
- March 2001
Project Highlights
Contracted to supply qualified personnel for TBM recovery operation after flooded tunnel collapse.