2013
Jul 31

Condition Survey of Marine Piles in Marina

Clearwater Bay Golf & Country Club

The Company has been awarded the contract by CWBGCC with Ove Arup & Partners Hong Kong as the Engineer designate.

The underwater survey works will be carried out on selected marine piles inside the marina basin at the prestigious Clearwater Bay Golf & Country Club, which is located at the southeast of Clear Water Bay Peninsula.

The contract scope of works includes the following;

  • GV & CV Inspection and surveying of steel tubular piles incl. underwater CCTV footage;
  • Pile thickness measurement using subsea NDT UT equipment;
  • Sediment sampling for sulphate Reducing Bacteria (SRB) testing and coordination with laboratory;
  • Preparation and submission of inspection and surveying report;

The survey works will commence immediately and will be completed within the planned 35-day schedule.

article_0006